Nine West #2591
Anthem, Arizona
Finish Pictures
click on links below to view project progression
1 2
3 4
Final
click on thumbnails below for larger view |
 |
Finished floor back to front. |
| Back of store |
 |
 |
back to front |
| Back to front |
 |
 |
side to side |
side to side
security watching diligently |
 |
 |
Front corner |
| New entry with cove base installed |
 |
 |
Transition of three floor medias, carpet, tile and aluminum
mat. |
| Front to back |
 |
 |
Front to back |
| Front corner with new cove base. |
 |
 |
New store entry floor. |
| Finished carpet to cash wrap. |
 |
 |
Front to back |
| Front to back and out the door |
 |
 |
Seven porcelain tiles left on site for possible future repairs. |
| 5' X 12' of carpet left on site for possible
future repairs. Never know when someone will drop a cup of coffee and need a
patch inserted. |
 |
 |
Truck loaded and ready to head out at 4 AM. |
| |
|
| Another floor covering job well done by Ken
Frango. |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|